11/3/2023 0 Comments Revit bim 360 consultant modelI know many design consultants who use the Revit families provided by the supply chain and end up stripping out so many non-required data parameters. One of the big questions today that has been asked many times is, “Are we delivering the information which is actually required by the client?” or are we just including thousands of unneeded data fields within a model and wasting time including them. This was intentionally set up to use only what was officially transmitted instead of the live Revit model saved on BIM 360 Teams. This data could be included as general information attached to the elements within the model, or structured as part of an IFC, COBie schema. location, asset id, manufacturer, asset no, warranty expiry date, etc). Experience deeper connected construction. That could be data to manage, maintain or operate the asset through the life cycle of that process (e.g. 1 of 5 BIM 360 is now part of the Autodesk Construction Cloud, connecting workflows, teams, and data to help you build better. When a project starts, the client, lead designer, contractor sets out what their information requirements will be and within that will be specific data delivery requirements. It is a process in which the model is a small, but integral part. And as we all know, BIM is not producing a Revit model with some data attached to the elements modeled within. Many project requirements ask for BIM to be delivered.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |